Reorder Level
The reorder level — also called the reorder point — is the stock quantity at which a replenishment order should be placed. Hit it, and you order; the remaining stock is intended to last exactly as long as the supplier takes to deliver, plus a buffer.
The formula
Reorder level = (Average daily usage × Lead time in days) + Safety stock
Three inputs, each of which has to be real rather than assumed:
- Average daily usage — how much you actually sell per day, from your own sales history, not from what you planned to sell.
- Lead time — how long the supplier actually takes from order to usable stock on your shelf. This includes clearing, transport and goods-in, not just the supplier's quoted dispatch time.
- Safety stock — the buffer absorbing variation in both of the above.
A worked example
A retailer sells 40 units a day of a SKU. The supplier's real lead time, measured over the last several orders, is 12 days. Safety stock is set at 150 units.
Reorder level = (40 × 12) + 150 = 480 + 150 = 630 units
When stock falls to 630, the order goes out. The 480 covers expected sales during the 12 days; the 150 covers a late delivery or a better-than-expected week.
Setting safety stock
Safety stock is the judgement call. It is driven by two kinds of variability:
- Demand variability — how much daily sales swing around the average.
- Supply variability — how much lead time swings around its average.
Where either is high, safety stock has to be higher. In Nigerian distribution the second is usually the bigger factor: supplier lead times vary with clearing delays, fuel and logistics, and FX availability for imported goods, so a lead time that averages 12 days may realistically run 9 to 25.
Use the realistic worst case for lead time, not the average, for critical lines. The cost of carrying a little more stock is almost always lower than the cost of being out of stock on your best-selling item.
What makes reorder levels go stale
A reorder level is a snapshot of assumptions, and assumptions move:
- Seasonality — a level set in a quiet month is wrong in December.
- A changed supplier or route, which changes lead time.
- Price or promotion changes that shift usage rate.
- Products reaching end of life, where reordering at all is the error.
Reviewing levels quarterly, and before any known seasonal peak, is the minimum discipline. Levels set once at system implementation and never revisited are a common and expensive failure.
Avant One℠ Commerce tracks usage and stock movement per SKU across locations, so reorder levels can be set from your own sales history rather than estimated.
Frequently asked questions
What is the reorder level formula?
(Average daily usage × lead time in days) + safety stock.
What is the difference between reorder level and safety stock?
Safety stock is the buffer. The reorder level is the total trigger quantity, which includes that buffer plus expected usage during the lead time.
How do I set safety stock?
From how much demand and lead time vary. The more either fluctuates, the larger the buffer needs to be — and in practice supply variability is usually the dominant factor.
How often should reorder levels be reviewed?
At least quarterly, and before any seasonal peak or supplier change.